Public Charging Operator, Bulgaria
A local charging operator runs a high-traffic public charging station along a major transport route in Sofia, Bulgaria's capital. The site serves a high volume of private EVs, taxis, and light commercial vehicles daily. As the number of electric vehicles continues to grow in Bulgaria, the existing charging infrastructure was no longer meeting user expectations for charging efficiency. The operator's goal was to expand fast-charging capacity at the site—improving user experience and increasing daily charging sessions without undertaking major grid upgrades.

The Challenge of Expanding Charging Capacity at a Public Site
For this public charging station, adding fast chargers was not simply a matter of installing more units. The site serves a diverse mix of vehicles—private cars, taxis, and light commercial vehicles—each with different charging interface and protocol requirements. At the same time, reliability is critical in public settings; any charging disruption can affect users' travel plans and damage the station's reputation. Additionally, the local grid has limited capacity, requiring careful load management to avoid impacting surrounding power supply when integrating new high-power equipment.
PowerBoost 100kW DC Fast Charger
100kW Fast Charging: Significantly improves charging efficiency, effectively reducing user waiting times
Dual CCS2 Connector Design: Enables simultaneous charging for two vehicles per unit, compatible with European mainstream charging standards, covering private EVs, taxis, and light commercial vehicles
Dynamic Power Distribution: Automatically adjusts power output based on the number of vehicles charging simultaneously, preventing grid overload
Modular Design: Individual module failure does not interrupt overall operation, ensuring charging service continuity

Improved Service Capacity at the Site
Since the six fast chargers were put into operation, the site has seen a noticeable increase in daily charging sessions, with reduced queuing during peak hours. The operator successfully expanded fast-charging capacity without the need for major grid upgrades.
If you are planning to upgrade a public charging station or expand an urban fast-charging network, feel free to contact SETEC POWER.